Rangajan Flow Irrigation Scheme |
|
The scheme is located at Koilamari Junubasti area of Lakhimpur
Dev. Block under Lakhimpur LAC. It was taken up under AIBP for
the year 2009-10 with an estimated cost of Rs. 140.00 Lakh which
commence from October 2010 and was completed on March 2013. The
estimated potential of the Scheme is 100 Hect.
|
Jubanagar DTW Pt. No-1 |
|
The scheme is located at Besapati village of Karunabari Dev. Block
under Nowboicha LAC. This is a completed and operative Scheme
and estimated potential is 36 Hect. The potential utilized as
per demand of cultivator.
|
Islampur DTW Scheme(Single Point) |
|
The Scheme is located at Islampur village of Karunabari Dev. Block
under Nowboicha LAC. The Scheme was commissioned on 1991-92. Thi
is a completed and operative Scheme and estimated potential is
36 Hect. The p[otential utilized as per demand of cultivator.
|
Dafalajan DTW Pt. No.-1 |
|
The Scheme is located at Bishnupur Gaon of Karunabari Dev. Block
under Nowboicha LAC. This Scheme is commissioned on 1991-92. The
estimated potential of the Scheme is 36 Hect. The Scheme is operative
and potential utilized as per demand of cultivator.
|
Phulbari Dhemagarh DTW Pt. No.-2 |
|
The Scheme is located at Dhemagarh village of Nowboicha Dev. Block
under Nowboicha LAC. The Scheme was originally commissioned in
the year 1991-92. The estimated potential is 36 Hect. The Scheme
is operative and potential utilized as per demand of cultivator
|
Jubanagar DTW Scheme Pt. No.-2 |
|
The Scheme is located at 2 No. Islampur village of Karunabari
Dev. Block under Nowboicha LAC. This is a completed and operative
Scheme and estimated potential is 36 Hect. Water supplied to the
paddy field for 6.0 Hect. during last Rabi crops. Kharif programe
is also taken up after joint verification with Agriculture Depatment.
|
Laluk DTW Scheme Pt. No.-2 |
|
The Scheme is located at Pachim Laluk village of Karunabari Dev.
Block under Nowboicha LAC. The Scheme which was originally commissioned
in the year 1989-90 was taken up for 13th Finance Commission of
2011-12. The estimated potential of the Scheme is 36 Hect. The
Scheme is operative and potential utilized as per demand of cultivator.
|